Resilient floor construction process and technical requirements
Published:
Feb 27,2023
1. Use a thermometer and hygrometer to detect the temperature and humidity. The indoor temperature and the surface temperature should be 15°C, and the construction should not be below 5°C and above 30°C. The relative air humidity suitable for construction should be between 35% and 75%. 2. Use a moisture content tester to detect the moisture content of the base layer, and the moisture content of the base layer should be less than 4%.
1. Use a thermometer and hygrometer to detect the temperature and humidity. The indoor temperature and the surface temperature should be 15°C, and the construction should not be below 5°C and above 30°C. The relative air humidity suitable for construction should be between 35% and 75%.
2. Use a moisture content tester to detect the moisture content of the base layer, and the moisture content of the base layer should be less than 4%.
Related News
E-MAIL:
Mobile Phone Number:
+86 137 5099 8850
+86 159 6168 5315
Factory Address:
No.12, Donglin Road, Zhouzhuang Town, Jiangyin City, Jiangsu Province, China
Operation Center Address:
16th Floor, No.1 Sandun St., Xihu District, Hangzhou City, Zhejiang Province, China
Copyright © 2023 Jiangsu LEOPOR New Materials Co., Ltd
